Equipment Pre-Commissioning

Getting technology ready before it arrives on site is one of the most effective ways to de-risk delivery. Equipment pre-commissioning ensures devices, platforms and integrations are configured, tested and verified in advance — reducing installation time, minimising disruption and improving first-time success, particularly in live buildings.


How we help

Reduced On-Site Risk

Problems solved before installation

Issues identified and resolved off site
Fewer surprises during deployment
Lower risk in live operational environments

Faster Installation

Ready to install, ready to work

Pre-configured devices minimise on-site setup
Shorter installation and commissioning windows
Improved coordination with contractors and FM teams

Consistent, Repeatable Delivery

Quality you can rely on

Standardised configurations across all devices
Clear labelling and documentation
Reliable outcomes across portfolios and projects

Why it matters

On-site configuration introduces risk, delay and disruption. Pre-commissioning reduces these risks and supports faster, more reliable delivery.

  • Live environments leave little room for error
  • Unconfigured devices slow installation and commissioning
  • Inconsistent setup leads to faults and rework
  • Late discovery of issues impacts programme and cost

Outcomes You Can Expect

Shorter On-Site Programmes

Reduced installation and commissioning time.

Lower Delivery Risk

Issues resolved early, before they impact live operations.

Higher First-Time Success

Systems work as intended from day one.

How Tekifi delivers

  • Configure firmware, network settings and control logic
  • Set up integrations and platform connectivity
  • Verify correct operation through off-site testing
  • Label, document and quality-check all equipment
  • Package and ship devices ready for immediate installation